Critical Path Institute disclosed salaries
Last updated
H-1B/LCA filings put the median disclosed base wage at Critical Path Institute around US$85,879 a year. Here's the disclosed pay range and how it breaks down by role.
Disclosed base wage
The median disclosed base wage is US$85,879 a year, with most filings between US$83,490 and US$96,809.
| 25th percentile | US$83,490 |
|---|---|
| Median (50th percentile) | US$85,879 |
| 75th percentile | US$96,809 |
Disclosed base wage, from 5 H-1B/LCA filings, U.S. DOL OFLC.
This is the base wage employers attest on H-1B/LCA filings to meet the prevailing wage — it leaves out equity and bonus and reflects visa-sponsored hires, so it runs lower than total compensation. Read it alongside the advertised salary on each role page.
Not enough history to chart yet — a wage-over-time trend appears once two or more periods clear the sample threshold. It fills in as more H-1B/LCA filings load.
Disclosed wage data from the U.S. Department of Labor, OFLC.
Prep for these roles
CodePrep turns a job description into an adaptive quiz from a bank of tagged questions, scores your answers, and resurfaces the topics you miss.